|
|
ADDITIONS AND RENOVATIONS TO
NORTHEAST HIGH SCHOOL
St. Petersburg, Florida
This massive project designed to give Northeast High School a completely new
image will feature a new college campus style plaza. The predominant
buildings are a new two story Classroom / Administration / Art and Music
Building (82, 000 s.f.), renovated Gymnasium (27,220 s.f.), and Cafeteria
Building ( 21,300 s.f. ). Additionally one of the critical aspects of this
project was correction of site drainage. With the aid of computer model
analysis our design team finally solved Northeast High Schools flooding
problems.
The new Classroom / Administration Building has a dynamic Entry Mall which
will act as a Focal Point/ Gateway to a new rejuvenated campus. This
building includes, Administration Offices, Guidance Offices, and 30 varying
types of Classrooms / Labs. Additionally there a new Music and Art Suite was
added. The Art Suite includes classrooms for 2-D Art, and 3-D Art, complete
with associated support spaces. The Music Suite includes space for Vocal
Rehearsal and Band Rehearsal with associated Recording Studio’s, Ensemble
Rooms, and Robe / Instrument Storage. The Renovated Gymnasium offers a new
dynamic entrance lobby with space for Concessions, Public Toilets, Lockers,
and Weight Training. The existing gymnasium and Wrestling room was fully
renovated, with the Gymnasium receiving all new wood flooring and bleachers.
The new Food Service building will feature 7,600 s.f. of seating area, with
5,000 s.f. of Serving and Kitchen area.
These new additions totaling 142,000 s.f. was completed in January 2001. The
total construction cost was $17,750,000. |
|